1. Description
Huzhou Baoli Environmental Technology Co., Ltd. has been entrusted by Fangzheng Electric (Deqing) Co., Ltd. to conduct an environmental impact assessment for the "Annual Production of 2.2 Million Sets of New Energy Intelligent Drive Systems Project" of Fangzheng Electric (Deqing) Co., Ltd. According to relevant regulations and rules, we are now publishing the first environmental assessment information to the public.
2. Overview of the Construction Project
(1) Project Background
In 2022, global sales of new energy vehicles reached 10.0912 million units, a year-on-year increase of 55%. With the increase in sales, the share of new energy vehicles in global passenger cars has also risen, reaching a record high of 21% in December 2022 and exceeding 10% for the first time throughout the year, reaching 14%, an increase of 5 percentage points compared to the same period in 2021. In recent years, China's new energy vehicle industry has accumulated considerable first-mover advantages and scale advantages. Its battery technology and scale have entered the world's forefront, and drive motors have developed in sync with advanced international levels. It has gradually transitioned from a previous model of whole vehicle assembly, basic interior and exterior parts, and core parts joint ventures to a stage of deep localization of high-barrier core components.
Currently, the company's flat wire motors, representing the highest global standard for new energy drive motors, have completed research and development and are ready for mass production. Their parameters all meet or exceed the indicators announced by the most advanced products currently on the market, and they have reached cooperation intentions with multiple leading new energy vehicle companies such as SGMW, Weiran Power, FCH Transmission, and XPeng Motors. To meet the demand for upgrading and replacing drive motors in the new energy vehicle industry, the company plans to implement the annual production of 2.2 million sets of new energy intelligent drive systems project.
(2) Project Construction Scale and Content
This project (Project Code: 2303-330521-07-01-634218) intends to utilize idle factory buildings (Factory Building 1) and land within the factory area to construct new factory buildings totaling 218,736.93m2, purchase stator and rotor production lines and other equipment, and implement the annual production of 2.2 million sets of new energy intelligent drive systems project.
(3) Project Location and Land Use
The project is located on the south side of Chuangye Avenue in Shacun District, Luoshe Town, Deqing County. The land use is the company's own industrial land.
(4) Project Investment
The project investment is 1,696.76 million yuan.
3. Overview of the Construction Unit
Construction Unit: Fangzheng Electric (Deqing) Co., Ltd.
Contact Person: Mr. Yao Contact Number: 0578-2171041
4. Overview of the Evaluation Unit
Environmental Impact Assessment Unit: Huzhou Baoli Environmental Technology Co., Ltd.
Contact Person: Mr. Jia Contact Number: 13395729609 E-mail: 84109790@qq.com
Address and Postal Code: 327, 3rd Floor, Deqing Chamber of Commerce Building, Wulipai Road 70, Wukang Town, Deqing County (Postal Code: 313200)
5. Working Procedures and Main Tasks of the Environmental Impact Assessment
Working Procedures of the Environmental Impact Assessment: Collecting data, conducting site inspections, conducting investigations and analyses, conducting environmental status investigations and monitoring, conducting engineering analyses, conducting environmental impact assessments, proposing environmental protection measures, drawing conclusions, compiling report books, conducting expert reviews, and submitting to environmental protection departments for approval.
Main Tasks of the Environmental Impact Assessment: Based on the collection of data, site inspections, environmental quality status monitoring, and investigations and analyses, in accordance with relevant national laws and regulations, evaluation technical guidelines, and project engineering design materials, conduct engineering analyses, conduct impact assessments on the atmosphere, surface water, noise, ecological environment, groundwater, soil, and environmental risks, and comprehensively analyze and demonstrate the project's environmental protection measures and site selection, propose relevant environmental protection requirements, draw evaluation conclusions, and submit them to the environmental protection authorities for approval.
6. Main Matters for Public Opinions and Suggestions
Opinions and suggestions related to environmental protection concerning this project are sought (questions unrelated to environmental protection will not be accepted).
7. Main Ways for the Public to Provide Opinions
The public can download the public opinion form (available in the link to this announcement) and provide feedback to the construction unit and environmental assessment unit via email, phone, or letter. The phone consultation time is from 08:30 to 11:30 in the morning and from 13:30 to 17:00 in the afternoon on weekdays.
Notice is hereby given.
Construction Unit: Fangzheng Electric (Deqing) Co., Ltd.
Evaluation Unit: Huzhou Baoli Environmental Technology Co., Ltd.
February 17, 2025
No Page
Let the passionate youth shine in the struggle and hard work
2024.10.11
Founder Micro Motor (Lishui)Co.,Ltd. officially set sail
2023.04.11
FDM kicked off future factory MOM system project
2023.04.10
FDM’s 1st Off-Tooling-Sample of G3.2 stator assembly rolled off the production line for NIO
2023.03.17